Earth operations and leveling in shed construction
Earth operations and leveling in shed construction
Blog Article
In the shed installation process, when the work reaches the stage of foundation implementation, before doing it, the shed bed must be ready to load the foundation, which is called earth work and leveling the bed of the shed, and it is usually accompanied by earthmoving operations, relocation of unsuitable soils and earth pouring to achieve the desired density.
From the importance of this stage, we can point out its role in the alignment of the foundation and consequently the structure and maintaining the balance of the shed. If it is not done correctly, the safety of your final product will not be ensured.
Construction and execution of industrial sheds by Arman Suleh Company
Arman Suleh Industrial Group has been monitoring the entire process by carrying out all the stages of design, construction and installation of the shed directly, and finally evaluating each of these stages, so that all the necessary standards are met in the progress of the project.
Since the efficiency of the shed is directly related to its construction and quality, in addition to the design and construction of parts and structures, the preparation of the substrate and installation are also very important. Therefore, maximum care should be taken in choosing its executor. At Arman Sule, we guarantee the accurate execution of various operations in the process of building the shed with sensitivity on the correct implementation of all steps, in the presence of experienced experts in each field and with the aim of achieving maximum customer satisfaction.
As it was said, before the implementation of the foundation, its suitable substrate must be prepared. In fact, the right substrate is to reach the desired level of the soil with the approved density, which has the ability to bear the result of the loads of the shed. Therefore, in order to have such conditions and to reach virgin soil that is suitable for the implementation of the foundation, earthworks and leveling must be done.
Virgin soil or natural soil is actually the most suitable soil for foundation implementation. It is not difficult to recognize it either; By knowing the type of manual and vegetable soil, virgin soil can be described as free of any human-made or plant waste.
Sometimes the ground consists of substandard, unsuitable and poor quality soil layers that do not have the proper load capacity. For example, manual soil, vegetable soil or unnatural soils are unsuitable for foundation implementation. The operation of removing these poor soils to have a safe loading surface is called decoupage.
Ek Dasti is soil that is taken from another place and transferred to a new place. Construction debris is one of these. This type of soil is usually deposited in an abandoned place and is usually hidden from view after a while and is known as a disturbing factor during foundation excavation. Because they do not have load bearing capacity and it causes asymmetric settlement of the structure.
Vegetable soil is the worn-out soil in which the roots and leaves of plants can be seen. It does not have the ability to load at all, and the soil sinks even with a slight pressure of the finger.
You should pay attention to the fact that this type of poor soil cannot be made resistant by adding lime water!